Call us: +91 78388 66688

Free shipping on all orders over ₹999

Solid State Drives (SSD) · 2.5"

Consistent 512GB Internal SSD

MPN CTSSD512S6  ·  Brand Consistent  ·  2.5"

The Consistent S6 512GB Internal SSD (CTSSD512S6) is a 2.5-inch SATA III drive offering 512GB of storage with a 5-year manufacturer warranty — a straightforward upgrade for laptops and desktops

Capacity 512GB Interface SATA Form Factor 2.5" Warranty 5 Years
₹6,240.00

Inclusive of GST · GST invoice available

In stock, ready to ship today
Warranty
5 Years
Dispatch
24–48 hrs
Returns
7-day
01

Overview

The Consistent S6 512GB Internal SSD (model CTSSD512S6) is a 2.5-inch solid-state drive designed for users looking to upgrade the storage in their laptop or desktop computer. Using the widely supported SATA III interface, this drive slots into any system equipped with a standard 2.5-inch drive bay and a SATA connection — covering the vast majority of consumer laptops and desktop PCs manufactured in the past decade. Solid-state drives inherently offer advantages over traditional mechanical hard drives: no spinning platters means the drive is less vulnerable to vibration and physical shock, generates less heat during operation, and draws lower power — a meaningful benefit for laptop users seeking longer battery life. The SATA III interface provides a mature and broadly compatible pathway for everyday computing tasks including operating system loading, application launches, and file transfers. With 512GB of usable capacity, this drive offers enough room for a full operating system installation, a suite of productivity or creative applications, and a substantial personal file library — making it a practical choice for students, office users, and anyone refreshing an ageing system without breaking the budget. Consistent backs this drive with a 5-year manufacturer warranty, which reflects a meaningful level of confidence in long-term durability for a value-segment product. The S6 series positioning and the CTSSD512S6 model designation confirm this is a distinct product line within the Consistent storage range. Verified Specifications: - Model Number: CTSSD512S6 - Series: S6 - Capacity: 512 GB - Form Factor: 2.5-inch - Interface: SATA III - Warranty: 5 Years - NVMe: No - TBW (Terabytes Written): Not published by manufacturer - Sequential Read / Write Speed: Not published by manufacturer Note: Speed ratings, TBW endurance figures, and NAND type have not been disclosed by the manufacturer in available sources. Buyers requiring specific performance benchmarks should consult Consistent's official product page before purchase

02

Datasheet

Warranty

5 Years

Capacity

512GB

Form Factor

2.5"

Interface

SATA

Series

S6

Model

CTSSD512S6

03

Complete your build

Free shipping

On all orders above ₹999

Easy returns

Money Back Guarantee

C.O.D. Available

Cash On Delivery Available

100% Secure Checkout

UPI / MasterCard / Visa