Corsair Vengeance RGB 8GB 5200MHz CL40 DDR5 RAM
MPN CMH8GX5M1B5200C40 · Brand CORSAIR
Corsair Vengeance RGB 8GB DDR5 5200MHz CL40 single-module UDIMM (CMH8GX5M1B5200C40) with Intel XMP 3.0 support and ten-zone iCUE RGB lighting, optimised for Intel 600 and 700 Series motherboards
Inclusive of GST · GST invoice available
Overview
The Corsair Vengeance RGB DDR5 8GB (1×8GB) kit — model CMH8GX5M1B5200C40 — is a single-module UDIMM designed for Intel DDR5 platforms, including Intel 600 Series and Intel 700 Series motherboards. Operating at up to 5200 MT/s with tight CL40-40-40-77 timings, this kit delivers the wider internal bus and improved power architecture that define the DDR5 standard compared to its predecessor. Each module features ten individually addressable RGB LED zones housed beneath a panoramic light bar. Lighting effects can be configured through Corsair's iCUE software, which also exposes Intel XMP 3.0 profile management — letting you save and switch between custom performance profiles on a per-application or per-task basis without manually re-entering BIOS settings each time. Voltage regulation is handled module via a built-in Power Management Integrated Circuit (PMIC), which helps maintain stable output during overclocking. The module's overclock voltage is rated at 1.25 V, while the SPD base voltage is 1.1 V. A solid aluminium heatspreader conducts heat away from the ICs, complemented by a custom performance PCB engineered for signal quality and stability at higher frequencies. Memory chips are hand-sorted and tightly screened at the factory, supporting consistent high-frequency operation with aggressive timing options. The speed rating is PC5-41600 (DDR5-5200), and the SPD base speed is 4800 MHz. This kit is a single-module (1×8GB) configuration, making it suited to a single-channel setup or as a starting point to expand with a matching module in the future. Verified Specifications: - Part Number: CMH8GX5M1B5200C40 - Capacity: 8 GB (1×8 GB) - Memory Type: DDR5 UDIMM - Series: Vengeance RGB DDR5 - Tested Speed: 5200 MT/s (PC5-41600) - SPD Base Speed: 4800 MHz - Tested Latency: CL40-40-40-77 - Tested Voltage: 1.25 V - SPD Voltage: 1.1 V - Performance Profile: Intel XMP 3.0 - Compatibility: Intel 600 Series, Intel 700 Series - LED Lighting: 10-zone individually addressable RGB per module - Heatspreader: Aluminium - Colour: Black - Warranty: Limited Lifetime
Datasheet
| Warranty | Lifetime |
|---|---|
| Capacity | 8GB |
| Kit Type | 8GB x 1 |
| Timing | 40-40-40-77 |
| Voltage | 1.25 V |
| Model | CMH8GX5M1B5200C40 |
| Speed | 5200 MHz |
| Lighting | RGB |
| Profile Type | Intel XMP |
| Product Series | VENGEANCE RGB |
| Memory Type | UDIMM |




