Call us: +91 78388 66688

Free shipping on all orders over ₹999

Solid State Drives (SSD) · M.2 2280

MSI Spatium Pro M470 1TB M.2 NVME Gen4 Solid State Drive ( SSD )

MPN MSI-SPATIUM-PRO-M470-1TB-M-2-NVME-GEN4  ·  Brand MSI  ·  M.2 2280

The MSI Spatium M470 Pro 1TB M.2 2280 NVMe SSD delivers PCIe Gen4 sequential reads up to 6000 MB/s and writes up to 4500 MB/s with a 320 TBW endurance rating and a 5-year warranty

Capacity 1TB Interface PCIe Gen4 Read Speed Up to 6000 MB/s Write Speed Up to 4500 MB/s
₹26,385.00

Inclusive of GST · GST invoice available

Out of stock
Warranty
5 Years
Dispatch
24–48 hrs
Returns
7-day
01

Overview

The MSI Spatium M470 Pro is a 1TB internal solid-state drive built on the PCIe Gen4 interface, delivering sequential read speeds of up to 6000 MB/s and sequential write speeds of up to 4500 MB/s. These figures make it a capable storage upgrade for gamers and creative professionals who want faster application launches, shorter game load screens, and quicker file transfers without the bottlenecks of older PCIe Gen3 hardware. Adopting the M.2 2280 form factor, the drive fits the standard slot found in most modern desktop motherboards and laptops. The compact single-sided layout means it slots neatly into thin-and-light notebooks as well as full-size ATX builds. Installation requires no external power connector — simply seat the drive and secure it with the retention screw. MSI specifies an endurance rating of 320 TBW (terabytes written) for this 1TB model, reflecting a drive designed for sustained, long-term workloads. The NVMe 1.3 protocol keeps command queue depth and latency well below what legacy SATA SSDs can achieve, contributing to snappier system responsiveness across the board. Built-in error-correction capabilities help maintain data integrity over the drive's lifespan, working alongside the 3D NAND flash storage to extend overall longevity. A 5-year limited warranty from MSI provides additional assurance for purchasers. For users building or upgrading a PCIe Gen4-capable system — paired with compatible motherboards such as AMD X570/B550/X670 or Intel 12th-gen and newer platforms — the Spatium M470 Pro 1TB represents a straightforward path to high-bandwidth primary or secondary storage. Verified Specifications: • Model: SPATIUM-M470-PRO-1TB • Capacity: 1 TB • Form Factor: M.2 2280 • Interface: PCIe Gen4 x4 • Protocol: NVMe 1.3 • Sequential Read: Up to 6000 MB/s • Sequential Write: Up to 4500 MB/s • Endurance (TBW): 320 • Warranty: 5 Years • Heatsink: Not included

02

Datasheet

Warranty

5 Years

Capacity

1TB

Form Factor

M.2 2280

Interface

PCIe Gen4

Tbw

320

NVME

Yes

Series

SPATIUM M470

Model

SPATIUM-M470-PRO-1TB

Read Speed

Up to 6000 MB/s

Write Speed

Up to 4500 MB/s

03

Complete your build

Free shipping

On all orders above ₹999

Easy returns

Money Back Guarantee

C.O.D. Available

Cash On Delivery Available

100% Secure Checkout

UPI / MasterCard / Visa