Call us: +91 78388 66688

Free shipping on all orders over ₹999

Solid State Drives (SSD)

TEAM GROUP T-Force Delta R RGB 250GB 2.5 SATA SATA 3 Solid State Drive (SSD)

MPN T-FORCE-DELTA-R-250GB  ·  Brand TeamGroup

Feature of TEAM GROUP T-Force Delta R RGB 250GB 2.5 SATA SATA 3 Solid State Drive (SSD) ULTRA LARGE RGB LUMINOUS AREA TEAMGROUP T-FORCE DELTA RGB SSD has an industry leading RGB luminous panel size. The non-luminous area to luminous area ratio is 5:3, which makes your computer and storage device more colorful and brighter than ever. HIGH SPEED AND GREAT PERFORMANCE The maximum read speed of the T-FORCE DELTA RGB SSD (Dreamy Aurora) is 560MB per second, and booting or loading games will only take

Capacity 250GBGB Warranty 3 Years color Black Voltage DC 5V
₹3,095.00

Inclusive of GST · GST invoice available

Out of stock
Warranty
3 Years
Dispatch
24–48 hrs
Returns
7-day
01

Overview

Feature of TEAM GROUP T-Force Delta R RGB 250GB 2.5 SATA SATA 3 Solid State Drive (SSD)

ULTRA LARGE RGB LUMINOUS AREA

TEAMGROUP T-FORCE DELTA RGB SSD has an industry leading RGB luminous panel size. The non-luminous area to luminous area ratio is 5:3, which makes your computer and storage device more colorful and brighter than ever.

HIGH SPEED AND GREAT PERFORMANCE

The maximum read speed of the T-FORCE DELTA RGB SSD (Dreamy Aurora) is 560MB per second, and booting or loading games will only take a few seconds.

LIGHTWEIGHT AND THIN

The T-FORCE DELTA RGB SSD has a standard 2.5″ form factor with only 9.5mm in height. Whether for a gaming laptop or desktop, upgrades can be done effortlessly.

TOUGH PROTECTION

The T-FORCE DELTA RGB SSD uses 3D NAND flash memory chip, which is durable, shockproof, drop resistant, and offers a total protection for the data. Even if you accidentally drop it on a hard surface, it can still prevent damage and data corruption from accidents. Discover the perfect balance of performance and affordability with our unbeatable ssd drive.

DURABLE AND RELIABLE

Effectively reduces performance degradation and wear and tear of the drive. Includes features that enhance the reliability of data transfer and prolongs the service life of the SSD perfectly.

Specifications of TEAM GROUP T-Force Delta R RGB 250GB 2.5 SATA SATA 3 Solid State Drive (SSD)

Interface DATA: SATA Rev. 3.0 (6Gb/s) – with backwards compatibility to SATA Rev. 2.0
RGB Signal: USB Micro B type
Capacity 250GBGB
Color Black
Voltage DC 5V
Operation Temperature 0°C ~ 70°C
Performance ATTO / Crystal Disk Mark:
250GB Read: 560MB/s; Write: 500MB/s
IOPS:
250GB 4K Random Read/Write: 90K/80K IOPS max
Dimensions 100(L) x 69.9(W) x 9.5(H)mm
Humidity 0°C – 55°C / 5% – 95% RH, non-condensing
Vibration 20G (non-operating)
Shock 1500G
MTBF 1,000,000 hours
Warranty 3-year limited warranty
02

Datasheet

Warranty

3 Years

color

Black

Voltage

DC 5V

Interface

DATA: SATA Rev. 3.0 (6Gb/s) – with backwards compatibility to SATA Rev. 2.0

Mtbf

1,000,000 hours

Shock

1500G

Humidity

0°C – 55°C / 5% – 95% RH, non-condensing

Vibration

20G (non-operating)

Dimensions

100(L) x 69.9(W) x 9.5(H)mm

Performance

ATTO / Crystal Disk Mark

Operation Temperature

0°C ~ 70°C

Capacity

250GBGB

03

Complete your build

Free shipping

On all orders above ₹999

Easy returns

Money Back Guarantee

C.O.D. Available

Cash On Delivery Available

100% Secure Checkout

UPI / MasterCard / Visa