WD Green 250GB SATA SSD
MPN WDS250G5G0A-00CPT0 · Brand WESTERN DIGITAL (WD) · 2.5"
The WD Green 250GB 2.5" SATA SSD (WDS250G5G0A-00CPT0) delivers read speeds up to 545 MB/s, shock-resistant solid-state reliability, and a 3-year limited warranty — an accessible upgrade for laptops and desktops alike
Inclusive of GST · GST invoice available
Overview
The WD Green 250GB SATA SSD (model WDS250G5G0A-00CPT0) is an internal solid-state drive designed to help you expand or replace storage in laptops and desktop computers without breaking your budget. Built around the familiar 2.5-inch, 7mm cased form factor, it slots into the vast majority of modern notebooks and desktop bays that support a standard SATA interface, making it a straightforward upgrade path for aging systems. With sequential read speeds of up to 545 MB/s, the WD Green SATA SSD delivers noticeably snappier boot times and faster application launches compared to traditional spinning hard drives. Everyday computing tasks such as browsing, casual gaming, and streaming or downloading video files benefit from the improved data throughput that solid-state technology provides over mechanical storage. Because SSDs have no moving parts, the WD Green is inherently more resistant to the vibration and physical shocks that can compromise a spinning hard drive when a laptop or desktop is accidentally bumped or dropped. This design characteristic helps protect the data stored on the drive during normal daily use. Western Digital bundles free access to Acronis True Image for SanDisk, a data-migration utility that lets you clone your existing drive to the new SSD without reinstalling the operating system or applications. Note that a SATA-to-USB cable or a compatible adapter may be required for the cloning process and is sold separately. Once the drive is installed, the downloadable SanDisk Dashboard software lets you monitor drive health, check available storage, and keep the firmware current. Verified Specifications: - Model / SKU: WDS250G5G0A-00CPT0 - Series: WD Green - Capacity: 250 GB - Interface: SATA (2.5-inch / 7mm cased) - Form Factor: 2.5 INCH - Sequential Read Speed: Up to 545 MB/s - Sequential Write Speed: Not specified by source - Operating Temperature: 0°C to 70°C - Non-Operating Temperature: -55°C to 85°C - Dimensions (L × W × H): 3.96" × 2.75" × 0.28" - Warranty: 3-year limited The drive ships ready to install and is compatible with both laptop and desktop systems that feature a SATA interface. A 3-year limited warranty from Western Digital provides peace of mind for everyday storage needs
Datasheet
| Warranty | 3 Years |
|---|---|
| Capacity | 250GB |
| Form Factor | 2.5" |
| Interface | SATA |
| Series | Green |
| Read Speed | Up to 545 MB/s |



